Luiz C Oliveira – Editorial Jornal Portuário
02/05/2026 1:42 pm – Updated 2 hours ago
3 Min
Internal Pages – Super (728×90) – Position 1
Disclosure
Click here to Read the Summary
The container ship ONE Synergy made its inaugural call at the Port of Santos after bringing forward its scheduled arrival in January. The docking took place at BTP and marked another step for ONE in expanding its sustainable fleet in Brazil.
The Port of Santos, the largest port complex in Latin America, received this Wednesday (05) the container ship ONE Synergyfrom the shipping company Ocean Network Express (ONE)on its inaugural call at the largest port in Latin America.
Internal Pages – Super (728×90) – Position 14
The vessel was initially expected for January 6th, had its early arrival and docked at 04h30 already Brazil Port Terminal (BTP)one of the largest and most modern terminals in the port of Santos.
Built in 2025 and operating under the Singapore flag, ONE Synergy is part of ONE’s new generation fleet and draws attention for its grandeur and operational capacity.
Com 336 meters long, 51 meters of mouth and approximate capacity 13,700 NOthe ship reinforces the strategic role of the Port of Santos as the main logistics hub for Brazilian foreign trade.
The operation marks a symbolic moment for the shipping company in the country.
In celebration of the inaugural call, company representatives must follow the official registration of the event, highlighting the importance of the vessel for the company’s operations in South America.
ONE Synergy operates on ONE’s global services, connecting routes between Asia, South America and other major international marketsincreasing the efficiency of logistics chains and strengthening the flow of cargo between continents.
Despite currently having conventional propulsionthe ship was designed according to the latest energy efficiency and sustainability standards.
The vessel is already prepared for future technological adaptations, such as the use of cleaner alternative fuelsincluding methanol or ammonia, aligning with ONE’s strategy of reducing emissions and moving towards the goal of net-zero.
Recognized as one of the world’s largest container carriers, Ocean Network Express maintains a solid presence on major global shipping routes.
The arrival of ONE Synergy at the Port of Santos reinforces not only the shipowner’s commitment to the Brazilian market, but also the leading role of the Santos port in receiving large, state-of-the-art ships.
After operating in the Port of Santos, ONE Synergy continues its international schedule with its next destination in Singapore, where it is scheduled to dock at the PSA Corporation Limited terminal, one of the largest and most strategic port complexes in the world.
The stopover reinforces the ship’s integration with Ocean Network Express’ main global routes, connecting Brazil to key logistics hubs in Asia and increasing the efficiency of cargo flow between continents.
Inner Pages – Super (728×90) – Position 13