Baker Hughes to Supply Subsea Production Systems for Cronos Field off Cyprus
Baker Hughes has secured a significant contract from Eni to supply subsea production systems and services for the Cronos deepwater gas development offshore Cyprus…
Baker Hughes has secured a significant contract from Eni to supply subsea production systems and services for the Cronos deepwater gas development offshore Cyprus, with initial equipment deliveries expected in the first half of 2027.
The contract, booked in the third quarter of 2026, covers deepwater subsea trees, wellheads, connectors, manifolds, topside controls and associated services, Baker Hughes announced.
Work on the project is already underway, with Baker Hughes set to deploy standardized and configurable subsea production systems to support Eni's accelerated development schedule.
The solutions are designed to reduce project complexity, minimize delivery risks and improve schedule predictability, helping Eni advance the project towards first gas.
This story was originally published by Offshore Engineer. Read the full story at Offshore Engineer →




Conversation