Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Thursday
November 26, 2026
The Port Journal

ExxonMobil eyes $2bn savings from repeat FPSO design in Guyana

US energy major ExxonMobil is looking to cut development costs by up to $2bn offshore Guyana by replicating the design of its recently sanctioned Longtail FPSO for another project. ExxonMobil Guyana president Alistair Routledge…

1 min read

US energy major ExxonMobil is looking to cut development costs by up to $2bn offshore Guyana by replicating the design of its recently sanctioned Longtail FPSO for another project.

ExxonMobil Guyana president Alistair Routledge said the company was looking to leverage engineering, procurement, and fabrication work undertaken for Longtail in the proposed Haimara development.

The approach would allow ExxonMobil and its partners to reuse design work, materials, and supply chain arrangements across the two gas and condensate projects.

ExxonMobil took the final investment decision on the $12.5bn Longtail development earlier this month, with first production targeted for 2030.

This story was originally published by Splash247. Read the full story at Splash247 →

Conversation

Comments are moderated before publication.

More in Shipping

View all
BACK TO TOP ▲