Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Thursday
October 22, 2026
The Port Journal

FRPD, Van Oord keep Fraser River navigable

Bird Construction's subsidiary Fraser River Pile and Dredge (FRPD), along with their partner Van Oord, is providing maintenance dredging services...

1 min read
FRPD, Van Oord keep Fraser River navigable
Photo: Dredging Today

Bird Construction's subsidiary Fraser River Pile and Dredge (FRPD), along with their partner Van Oord, is providing maintenance dredging services for the Fraser River navigation channel.

According to Bird, this work will help maintain safe and efficient access to the Port of Vancouver and support more than $100 billion in annual trade moving through the Fraser River corridor.

In September 2025, Van Oord and FRPD's partnership - RiverFlow Dredging (RiverFlow) - entered into a long-term agreement with the Vancouver Fraser Port Authority to provide maintenance dredging services for the Fraser River navigation channel.

RiverFlow's scope of work encompasses annual maintenance dredging of the Fraser River South Arm deep-sea channel, including the berths and approaches to the DP World Fraser Surrey marine terminal.

This story was originally published by Dredging Today. Read the full story at Dredging Today →

Conversation

Comments are moderated before publication.

More in Ports

View all
BACK TO TOP ▲