Fugro completes 2026 survey campaign for Ireland’s 900 MW offshore wind project
Fugro has completed the 2026 marine and coastal survey campaign for the Irish transmission system operator (TSO) EirGrid and the Powering Up...
1 min read
Fugro has completed the 2026 marine and coastal survey campaign for the Irish transmission system operator (TSO) EirGrid and the Powering Up...
This story was originally published by Offshore Energy. Read the full story at Offshore Energy →




Conversation