Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Wednesday
November 4, 2026
The Port Journal

Fugro Secures New Offshore Wind Survey Work in UK Waters

Fugro has secured a contract from Cadeler to carry out post-installation seabed surveys at the 960 MW East Anglia TWO offshore wind farm in the UK, with work scheduled to begin in early 2027…

1 min read
Fugro Secures New Offshore Wind Survey Work in UK Waters
Photo: Offshore Engineer

Fugro has secured a contract from Cadeler to carry out post-installation seabed surveys at the 960 MW East Anglia TWO offshore wind farm in the UK, with work scheduled to begin in early 2027.

The contract covers surveys at 64 monopile foundation locations to verify installation quality and provide Geo-data to support the project's construction, Fugro announced on November 4.

Fugro will deploy its FCV 600 work-class remotely operated vehicle (ROV) from Cadeler's installation vessel to inspect the foundation locations and carry out installation-related activities.

The surveys will help confirm that the monopile foundations have been installed as planned and provide information to support their long-term integrity.

This story was originally published by Offshore Engineer. Read the full story at Offshore Engineer →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲