Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Tuesday
November 3, 2026
The Port Journal

Jadestone Restarts CWLH Production Offshore Australia, Output Climbs

Jadestone Energy's oil and gas production has risen to approximately 19,000 barrels of oil equivalent per day (boepd) following the restart of its Cossack, Wanaea…

1 min read
Jadestone Restarts CWLH Production Offshore Australia, Output Climbs
Photo: Offshore Engineer

Jadestone Energy's oil and gas production has risen to approximately 19,000 barrels of oil equivalent per day (boepd) following the restart of its Cossack, Wanaea, Lambert and Hermes (CWLH) oil fields offshore Western Australia.

Production resumed after repairs to a subsea riser J-tube and the reconnection of the Okha floating production, storage and offloading (FPSO) vessel to the fields' subsea infrastructure.

Production operations and well testing restarted in late September, with all but one production well now back online. The fields have produced approximately 8,000 barrels of oil per day (bopd) gross, or around 2,700 bopd net to Jadestone, in recent days.

An assessment of the remaining well identified an issue requiring remediation, with the operator evaluating options to restore production safely.

This story was originally published by Offshore Engineer. Read the full story at Offshore Engineer →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲