Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Tuesday
November 24, 2026
The Port Journal

LS Marine Solution selects NjordGuard cable protection for South Korean offshore wind farm

AIS, formerly CRP Subsea, and LS Marine Solution have signed a contract for the supply of NjordGuard cable protection systems (CPS) and...

1 min read
LS Marine Solution selects NjordGuard cable protection for South Korean offshore wind farm
Photo: Offshore Energy

AIS, formerly CRP Subsea, and LS Marine Solution have signed a contract for the supply of NjordGuard cable protection systems (CPS) and bellmouths for the Shinan-Ui Offshore Wind Farm, located around 4 kilometers off the coast of South Korea.

Per the agreement, AIS will supply 55 NjordGuard cable protection systems and 54 associated bellmouths, which are going to be used to protect the inter-array and export cables at the wind farm.

The cable protection systems and the bellmouths will be built at AIS’ purpose-built manufacturing facility in northwestern England. According to AIS, the CPS have been designed to meet the project's demanding technical requirements, including a 28-year design life.

Project engineering work will begin immediately, with delivery to South Korea slated for August 2027.

This story was originally published by Offshore Energy. Read the full story at Offshore Energy →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲