New pilot transfer requirements – prepare your fleet now
Our July Technical and Regulatory News highlighted the significant changes to pilot transfer arrangements introduced by the revised SOLAS Regulation V/23 and the new mandatory performance standards. Given the high level of customer interest…
Our July Technical and Regulatory News highlighted the significant changes to pilot transfer arrangements introduced by the revised SOLAS Regulation V/23 and the new mandatory performance standards. Given the high level of customer interest and the many questions received, we are providing this follow-up news to complement our July 2026 update.
The timeline for the new requirements: • 1 Jan. 2028: New pilot transfer arrangements installed from this date must comply with the new performance standards. All arrangements, regardless of installation date, must comply with the new requirements for operation, inspection, stowage, maintenance and familiarization.
• First survey on or after 1 Jan. 2029: Existing arrangements on SOLAS ships must be verified for compliance with the new design, construction, securing and installation requirements.
• First survey on or after 1 Jan. 2030: Corresponding verification is required for non-SOLAS ships.
This story was originally published by Hellenic Shipping News. Read the full story at Hellenic Shipping News →




Conversation