Pfizer Plans $650 Million Manufacturing Center in Groton, Connecticut
Pfizer will spend $650 million on a 220,000-square-foot center in Groton, Conn., to manufacture drugs for clinical trials, which will open in mid-2031.
1 min read
Pfizer will spend $650 million on a 220,000-square-foot center in Groton, Conn., to manufacture drugs for clinical trials, which will open in mid-2031.
This story was originally published by Supply Chain 24/7. Read the full story at Supply Chain 24/7 →




Conversation