Port of Gothenburg invests in electrified rail access
The Port of Gothenburg is installing overhead line infrastructure on the container terminal’s handling tracks, allowing electric locomotives to run directly to and from the terminal. This removes the need for diesel locomotives or…
The Port of Gothenburg is installing overhead line infrastructure on the container terminal’s handling tracks, allowing electric locomotives to run directly to and from the terminal.
This removes the need for diesel locomotives or detours via the port departure yard, and is intended to raise capacity, cut emissions and make rail operations more efficient.
The terminal is operated by APM Terminals and handles about 80 trains a week, linking the port with more than 20 destinations across Sweden.
Rail freight is growing: a record 529,000 TEU moved to and from the port by rail last year, and volumes have continued to rise in 2026.
This story was originally published by Container News. Read the full story at Container News →




Conversation