Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Monday
November 2, 2026
The Port Journal

Port of Los Angeles Wraps Up Work on SR 47 Interchange Project

As part of the project, the port relocated the southbound SR 47 off-ramp from the south to the north side of the Vincent Thomas Bridge.

1 min read
Port of Los Angeles Wraps Up Work on SR 47 Interchange Project
Photo: SupplyChainBrain

As part of the project, the port relocated the southbound SR 47 off-ramp from the south to the north side of the Vincent Thomas Bridge.

This story was originally published by SupplyChainBrain. Read the full story at SupplyChainBrain →

Conversation

Comments are moderated before publication.

More in Supply Chain

View all
BACK TO TOP ▲