Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Friday
October 23, 2026
The Port Journal

Prysmian's 193-meter CLV Alessandro Volta performing sea trials

Prysmian’s new cable-laying vessel (CLV) Alessandro Volta, built by Norway's VARD, has begun sea trials in Norway. The Norwegian ship designer...

1 min read
Prysmian's 193-meter CLV Alessandro Volta performing sea trials
Photo: Offshore Energy

Prysmian’s new cable-laying vessel (CLV) Alessandro Volta, built by Norway's VARD, has begun sea trials in Norway.

The Norwegian ship designer and shipbuilder commenced construction of the CLV in September 2024 at its shipyard in Tulcea, Romania, where the vessel’s hull was erected in September 2025.

In mid-January this year, Alessandro Volta left the shipyard in Romania for Norway, where its construction was completed.

Both Prysmian and VARD reported today, October 23, that the vessel was currently performing sea trials.

This story was originally published by Offshore Energy. Read the full story at Offshore Energy →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲