Rail freight trial slashes transport times
A rail freight trial between the Midlands and Glasgow has concluded that as a result normal transport times were slashed by half.
A rail freight trial between the Midlands and Glasgow has concluded that as a result normal transport times were slashed by half.
The four-week trial of a new high-speed service was conducted on the West Coast Mainline (WCML) by logistics operator GoExpress.
Reportedly, the trial saw 40ft high cubed intermodal containers travel at up to 90mph – up from the 75mph limit of conventional container trains – helping to reduce the rail transit time for the 315 mile journey from nine hours to just four hours and thirty minutes.
The proof-of-concept operation saw 54 test trains run on dedicated high-speed paths provided by Network Rail and was supported by the Department for Transport (DfT) through the Freight Innovation Fund (FIF) programme, which is delivered by Connected Places Catapult.
This story was originally published by Logistics Manager. Read the full story at Logistics Manager →




Conversation