Scottish Floating Wind Farm to Feature Siemens Gamesa Turbines
Green Volt has signed an agreement with Siemens Gamesa to reserve manufacturing capacity for 28 offshore wind turbines for the planned floating wind farm off Scotland…
Green Volt has signed an agreement with Siemens Gamesa to reserve manufacturing capacity for 28 offshore wind turbines for the planned floating wind farm off Scotland, alongside a separate agreement with the Port of Aberdeen for future marine logistics operations.
The turbine capacity reservation, described in the announcement as a world first for commercial-scale floating offshore wind, covers 28 high-capacity turbines, each capable of generating more than 15 MW.
The multimillion-dollar agreement secures manufacturing capacity and specialist engineering resources for the project, representing a significant procurement milestone as Green Volt moves towards construction.
Separately, Green Volt has signed a letter of intent with the Port of Aberdeen covering future anchor and mooring marshalling activities at Aberdeen South Harbour.
This story was originally published by Offshore Engineer. Read the full story at Offshore Engineer →




Conversation