First Oil Flows from Vietsovpetro's Platform Offshore Vietnam
Vietnam-Russia joint venture Vietsovpetro has started commercial oil production from the BK-26 platform at the Bach Ho field in Block 09-1, bringing the facility online 36 days ahead of schedule…
Vietnam-Russia joint venture Vietsovpetro has started commercial oil production from the BK-26 platform at the Bach Ho field in Block 09-1, bringing the facility online 36 days ahead of schedule.
First oil flowed at 7:15 a.m. on November 9, ahead of the originally planned December 15 start, Vietsovpetro said.
The BK-26 development comprises a wellhead platform connected by a bridge to the MSP-8 platform, which has been modified to receive and process production from BK-26. The project also involved relocating the MSP8–MSP4 subsea power cable.
Engineering design and procurement began in January 2025, followed by the start of construction on December 29, 2025.
This story was originally published by Offshore Engineer. Read the full story at Offshore Engineer →




Conversation