Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Saturday
November 7, 2026
The Port Journal

Maersk removes heavy-load surcharge on northwest India–Europe contract shipments

Maersk has withdrawn its Heavy Load Surcharge (HWS) for eligible 20-foot dry containers moving from northwest India to North Europe and the Mediterranean, effective from 7 November 2026. The change covers contract bookings through…

1 min read
Maersk removes heavy-load surcharge on northwest India–Europe contract shipments
Photo: Maritime Gateway

Maersk has withdrawn its Heavy Load Surcharge (HWS) for eligible 20-foot dry containers moving from northwest India to North Europe and the Mediterranean, effective from 7 November 2026. The change covers contract bookings through Nhava Sheva, Mundra, Pipavav and Hazira, removing the surcharge for containers with a Verified Gross Mass (VGM) exceeding 22 tonnes.

The announcement, issued on 6 November, sets the applicable HWS rate at zero. It gives exporters using the specified gateways a reduction in this component of their shipping charges, while other applicable freight-related charges continue.

The advisory specifies 20-foot dry containers, identified by Maersk’s equipment code 20DRY, on the following routes:

Eligibility is restricted to contract bookings. Local charges, contingency charges and other applicable surcharges remain payable. The withdrawal therefore changes a specific tariff component rather than establishing a new all-inclusive freight rate.

This story was originally published by Maritime Gateway. Read the full story at Maritime Gateway →

Conversation

Comments are moderated before publication.

More in Ports

View all
BACK TO TOP ▲