Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Tuesday
October 27, 2026
The Port Journal

Port of Long Beach revises environmental plans for Pier B rail project

The Port of Long Beach has released a revised draft supplemental environmental impact report for its Pier B On-Dock Rail Support Facility project, reflecting proposed design modifications to one of the port’s major rail…

1 min read

The Port of Long Beach has released a revised draft supplemental environmental impact report for its Pier B On-Dock Rail Support Facility project, reflecting proposed design modifications to one of the port’s major rail infrastructure developments.v

Announced on October 23, 2026, the recirculated environmental study examines changes involving rail infrastructure, utility connections, construction staging areas and nearby road facilities.

The most significant proposed modification involves the complete demolition of the Berths D52–D54 transit shed to accommodate the realignment of Pico Avenue.

The latest study follows an earlier draft released in September 2025, which examined the possibility of reconfiguring the existing transit shed rather than removing it entirely.

This story was originally published by Container News. Read the full story at Container News →

Conversation

Comments are moderated before publication.

More in Shipping

View all
BACK TO TOP ▲