Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Thursday
November 19, 2026
The Port Journal

ShoreLink launches TankerLink – shore power for tankers

ShoreLink has unveiled its new product at the Shore Power Summit in Rotterdam, the TankerLink, a new product line of cable management systems designed to connect tankers of all types, including FSRUs, shuttle tankers,…

2 min read
ShoreLink launches TankerLink – shore power for tankers
Photo: World Cargo News

ShoreLink has unveiled its new product at the Shore Power Summit in Rotterdam, the TankerLink, a new product line of cable management systems designed to connect tankers of all types, including FSRUs, shuttle tankers, chemical tankers and oil tankers, to shore power.

ShoreLink said tankers accounted for 2.72 million tonnes of CO2 emissions at berth in European Economic Area (EEA) ports in 2025, representing almost a third of emissions from ships at berth and 1.6 times the amount attributed to container ships. The company estimates this is equivalent to the annual emissions of more than 1.5 million cars. From 2030, however, the EU’s shore power requirements will apply only to container and passenger ships of 5,000 GT and above.

“With 33.8% of global merchant fleet capacity in tankers, shore power can’t stop at cruise ships, ferries and container vessels. TankerLink brings what we’ve learned from connecting those ships to the tanker segment, and our first tanker projects in Europe and South America are already under way,” says Kaupo Läänerand, Chief Commercial and Strategy Officer at ShoreLink.

ShoreLink said tanker adoption of shore power has been slow, with safety concerns remaining a key obstacle. Tanker berths vary in layout, with shore power connection points required at either the stern or midship and, in some cases, long distances between the vessel and the jetty. The presence of hazardous (ATEX) zones on parts of the vessel adds further complexity. ShoreLink said many berths and jetties worldwide were not originally designed to accommodate shore power connections.

This story was originally published by World Cargo News. Read the full story at World Cargo News →

Conversation

Comments are moderated before publication.

More in Ports

View all
BACK TO TOP ▲