Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Monday
November 16, 2026
The Port Journal

UK operator turns production taps on as first gas flows from $2.8 billion North Sea field

First gas has started flowing from a field in the North Sea, bringing what Adura describes as vital UK energy resources ashore in time for winter.

1 min read
UK operator turns production taps on as first gas flows from $2.8 billion North Sea field
Photo: Offshore Energy

Adura, an incorporated joint venture between UK-headquartered Shell and Norway’s Equinor, has brought online one of the North Sea’s most controversial gas projects, which is expected to power British homes and businesses.

The first production comes less than a month after the North Sea Transition Authority (NSTA) granted development and production consent for the Jackdaw field off the coast of northeast Scotland to Adura. This project represents £2.1 billion ($2.77 billion) of investment.

The company has emphasized that Jackdaw gas will funnel through the existing Shearwater production hub and onwards to the St Fergus gas terminal in Aberdeenshire before being supplied to homes and businesses across Britain.

When it reaches peak production in the coming months, the project is expected to produce enough gas to heat the equivalent of around 1.4 million UK homes, helping to reduce Britain’s reliance on imported energy, including liquefied natural gas (LNG), which carries a higher emissions footprint.

This story was originally published by Offshore Energy. Read the full story at Offshore Energy →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲