Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Wednesday
November 11, 2026
The Port Journal

WATCH: CETO parts start arriving at Port of Bilbao ahead of first stage water deployment

Carnegie Clean Energy has assembled the buoyant actuator, the prime mover of the CETO wave energy system, at the Port of Bilbao, as part of the...

1 min read
WATCH: CETO parts start arriving at Port of Bilbao ahead of first stage water deployment
Photo: Offshore Energy

Carnegie Clean Energy has assembled the buoyant actuator, the prime mover of the CETO wave energy system, at the Port of Bilbao, as part of the first stage of ocean deployment under the ACHIEVE Programme.

CETO is a fully submerged, point absorber-type wave energy technology device. A submerged buoy sits a few meters below the surface and moves with the ocean’s waves. This orbital motion drives a PTO system that converts this motion into electricity.

The unit will operate at the Biscay Marine Energy Platform (BiMEP) for two years, gathering data to validate CETO technology and advance commercialization.

The CETO Buoyant Actuator was built locally in the Basque Country using a modular design to simplify road transport, Carnegie said.

This story was originally published by Offshore Energy. Read the full story at Offshore Energy →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲