Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Thursday
November 19, 2026
The Port Journal

Windar Inks Turbine Tower Supply Deal for BC-Wind as Project’s First Monopiles Arrive at Świnoujście Port

Windar Polska will supply offshore wind turbine towers for Ocean Winds’ 390 MW BC-Wind project in the Polish Baltic Sea, for which the first...

1 min read
Windar Inks Turbine Tower Supply Deal for BC-Wind as Project’s First Monopiles Arrive at Świnoujście Port
Photo: offshoreWIND.biz

Windar Polska will supply offshore wind turbine towers for Ocean Winds’ 390 MW BC-Wind project in the Polish Baltic Sea, for which the first monopiles recently arrived at the port of Świnoujście.

Under an agreement signed with Siemens Gamesa on 18 November, Windar will manufacture and assemble towers for 26 SG 15-236 wind turbines at its Szczecin facility.

The tower agreement comes as BC-Wind advances towards offshore construction, following the arrival of the first monopile foundations at Świnoujście Offshore Terminal on 28 October.

Ocean Winds said this was the first time a Polish installation port had received foundations of this scale. The monopiles will be temporarily stored at the terminal before being prepared for transport and offshore installation, according to the project developer.

This story was originally published by offshoreWIND.biz. Read the full story at offshoreWIND.biz →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲