Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Tuesday
November 3, 2026
The Port Journal

Work continues on Pool 16 mooring cell on Mississippi River

The USACE Rock Island District said that the work continues on the mooring cell in Pool 16 of the Mississippi River between Davenport, Iowa, and...

1 min read
Work continues on Pool 16 mooring cell on Mississippi River
Photo: Dredging Today

The USACE Rock Island District said that the work continues on the mooring cell in Pool 16 of the Mississippi River between Davenport, Iowa, and Rock Island, Illinois.

"This mooring cell, part of the Navigation and Ecosystem Sustainability Program (NESP), seeks to provide time saving infrastructure for navigation while also preventing damage caused by erosion, prop wash, and groundings of barges waiting in other areas within this pool," USACE said.

Work on the cell is expected to wrap up this week and will be ready for industry use in early December, after a 28 day curing period for the concrete.

Built under the USACE Navigation and NESP, the structure provides time-saving infrastructure for commercial towboats.

This story was originally published by Dredging Today. Read the full story at Dredging Today →

Conversation

Comments are moderated before publication.

More in Ports

View all
BACK TO TOP ▲