Allseas taps Aker Solutions for recycling of 50,000-ton North Sea platform topside
Five decades after a North Sea platform was built, Aker Solutions has been selected to handle the dismantling and recycling of its topside.
Norway-based energy services provider Aker Solutions has been picked to oversee the final chapter of a 50,000-ton topside from a North Sea offshore platform, taking on its dismantling and recycling in a project that will bring the structure back to the Stord yard, where it was originally built in the 1970s.
While announcing a letter of intent (LOI) from Allseas for the reception, dismantling, and recycling of the topside from Equinor's Statfjord A platform in the North Sea, Aker Solutions explained that the platform was originally built at Stord in 1975 and prepared for installation on the concrete gravity base structure in 1976.
This platform has been an important contributor to production from the Statfjord field, one of the largest oil fields ever developed in the North Sea. As the original builder of the topside, Aker Solutions elaborates it has detailed knowledge of the structure and extensive experience in maintenance, modification, and life-extension work carried out over several decades.
The structure will now return to the yard to complete its life cycle. The LOI for a contract, worth between NOK 0.5 billion ($52 million) and NOK 1.5 billion ($155 million), covers disposal-related preparatory work, reception, dismantling, and recycling of the approximately 50,000-ton topside following offshore removal by Allseas' Pioneering Spirit heavy-lift vessel.
This story was originally published by Offshore Energy. Read the full story at Offshore Energy →




Conversation