Frontera plans Colombian LNG power plant
Canadian firm Frontera Energy is evaluating entry into power generation, anchored by its FSRU-based LNG import facility in Cartagena, Colombia, which is expected to start operations in 2027.
1 min read
Canadian firm Frontera Energy is evaluating entry into power generation, anchored by its FSRU-based LNG import facility in Cartagena, Colombia, which is expected to start operations in 2027.
This story was originally published by LNG Prime. Read the full story at LNG Prime →




Conversation