Skip to content
Baltic Dry1,942+1.84% SCFI1,388.6-2.10% WCI 40ft$2,214-1.35% Brent$74.18+0.62% VLSFO SG$548.5+0.40% Harpex2,2310.00% USD/BRL5.412-0.28% EUR/USD1.0864+0.11%
Tuesday
November 17, 2026
The Port Journal

Frontera plans Colombian LNG power plant

Canadian firm Frontera Energy is evaluating entry into power generation, anchored by its FSRU-based LNG import facility in Cartagena, Colombia, which is expected to start operations in 2027.

1 min read
Frontera plans Colombian LNG power plant
Photo: LNG Prime

Canadian firm Frontera Energy is evaluating entry into power generation, anchored by its FSRU-based LNG import facility in Cartagena, Colombia, which is expected to start operations in 2027.

This story was originally published by LNG Prime. Read the full story at LNG Prime →

Conversation

Comments are moderated before publication.

More in Offshore & Energy

View all
BACK TO TOP ▲